Design
Architectural drafting, Form 15 engineering, NatHERS rating and council pack.
Loading

Eight steps, three phases, one turnkey quote — and one project manager you actually speak to. Most builds land at handover in 10–14 weeks from deposit.
Free quote, contract, 50% deposit. Engineering and council kick off the same week.
Council lodgement runs in parallel with manufacturing so total lead time is compressed.
Ocean freight, customs, heavy haulage, crane-lift, unfold, connect, hand over the keys.
Architectural drafting, Form 15 engineering, NatHERS rating and council pack.
Off-site manufacturing under a documented QC checklist before dispatch.
Heavy haulage on drop-deck semi-trailer — we arrange the route + permits.
Crane lift, level, connect — typically one day on site to hand-over.
The customer touch-points are deliberately minimal — every step in between is on us, under one fixed turnkey price.
Each step lists the typical duration, the phase it belongs to, and the deliverables we own under your turnkey quote.
We don't substitute grades after the quote. The Colorbond roof profile and external cladding spec are locked in writing and inspected against the Form 15 sign-off before dispatch.

Sloped Colorbond rib profile — Monument shown. AS/NZS 1170.2 wind rated, full BlueScope warranty pass-through.

Painted weatherboard meeting timber accent and matt-black corner cap. Composite (WPC) and fibre-cement (Scyon) upgrades available.

Engineered for the Australian environment — BAL ratings, cyclone zones, off-grid sites and everything in between.
Indicative only. Each phase carries its own variables — factory backlog, council, shipping schedules, site access — and the total can extend beyond this range. We confirm your build’s expected timeline in writing at contract signing.